Catchment Management Plan

The main purpose of the Bradford Beck pilot project was to create a catchment management plan (CMP) over 2012 by working with the community, businesses and institutions that all have a stake in the health and future of the Bradford Becks.

The CMP was released on Tuesday 5th March 2013 and can be downloaded from the links below.

Bradfords Becks Plan – main document

Appendix 1 – Short history of the Bradford Beck

Appendix 2 – Water Quality in the Bradford Beck

Appendix 3 – Fish habitat survey

Appendix 4 – Riparian owners survey

Appendix 5 – Case studies of other urban rivers

Appendix 6 – outline designs of river restoration

Appendix 7 – Ecology survey

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

%d bloggers like this: